日本偷拍网站,欧洲美熟女乱又伦,亚洲国产精品无码久久久动漫,蜜臀精品无码AV在线播放

Two Wells vertical test in Oklahoma, USA

Classic Cases > Dissolvable Solutions > Two Wells vertical test in Oklahoma, USA

Two Wells vertical test in Oklahoma, USA

DISSOLVABLE FRAC PLUG SUCCESSFULLY SET AND HOLDS PRESSURE IN VERTICAL SECTION OF TWO WELLS. ANADARKO BASIN, CANADIAN COUNTY, OKLAHOMA, USA

OPERATIONS

Frac plugs were umped downhole, and set in the vertical section of each well. After setting, the ball was dropped. The ball took under 5 minutes to seat. Pressure was increased to 1,500 psi and held for ~150 minutes with no increase in water used or pressure drop. This verifies that the plug both held position without slipping and effectively isolated the zone. Pressure was incrementally increased to 9,000 psi and held for ~30 minutes. When pressure reached 7,250 psi, total barrels pumped plateaued and did not increase, verifying that the plug effectively held pressure and maintained position.

After the test, the plug was easily milled out

WELL PROFILE

Oil well

STACK Formation MD 18,686 Ft

39 stages

11,500 psi

2% KCL

CHALLENGES

Other DFPs slipping or skidding

RESULTS

Plug 1 set in Well 1

Plug 2 set in Well 2

Both held pressure and position

Ball took less than 5 minutes to seat

四平市| 斗六市| 永昌县| 临湘市| 出国| 务川| 合作市| 岳西县| 乐清市| 太康县|